A team of qualified welders from Smartweld Center supports C-Metal with the adjustment of the Straatburg bridge for the “Construction site of the century”. The modifications are a starting point for the construction of the tunnel under the Albert Channel.
The welding is carried out in accordance with EN1090-2 and SB260.
100% visual and magnetic inspection.
Before the start of the project, the welders were trained and tested in Smartweld’s training and certification centre.
In collaboration with Odisee, Smartweld Center created a model and implementation plans for a flow measurement setup.
Subsequently, Smartweld Center built and installed a test setup for the training ‘measurement and control techniques’ of Odisee Campus Aalst.
The setup consists of a tank with pump, flow meters and control valves to generate a mini-process.
A team of qualified welders from Smartweld Center supports Sea-Invest – GCT with urgent repairs of hardfacing welding of crusher rolls. These repairs are necessary to ensure the continuity of the trade in bulk products.
The repairs are carried out in accordance with hardfacing welding processes and associated heat treatment.
100% visual and magnetic inspection.
The repairs fit into a further training and inspection protocol for maintenance staff of Smartweld Center.
Our team of skilled and qualified welders is trusted by clients from all kinds of sectors (from pharma to sidurgy) to provide high quality welding services. We are proud of our involvement in the prestigious Skybar project (Brussels Stock Exchange building) commissioned by C-metal in accordance with EN1090-2 EXC2.
With six welders on our team for this project, we delivered exceptional results within a very short deadline.
We thank C-Metal for the trust and smooth cooperation!